Crossing gives Shoreditch another string to its bow

 
Britain’s biggest mobile crane lifted and lowered into place a massive 350t bridge over Shoreditch High Street, London, last weekend.

The bridge will carry the East London Railway over the busy City thoroughfare when work to extend the line is completed. The full operation to secure the bridge in position lasted the entire weekend. The bow-string bridge was constructed just yards from where it was manoeuvred into position.

Transport for London project manager, Brian Noble, said ahead of the lift: ‘I’ve been in this business a good many years and have led a fair few extraordinary projects, but lifting this bridge in really was something to behold.

buying biaxin

buy discount clarithromycin buy biaxin australia purchase biaxin

ordering clarithromycin

buying clarithromycin http://www.geospatialworld.net/Event/View.aspx?EID=63#buyclarithromycin cheapest biaxin

Register now for full access


Register just once to get unrestricted, real-time coverage of the issues and challenges facing UK transport and highways engineers.

Full website content includes the latest news, exclusive commentary from leading industry figures and detailed topical analysis of the highways, transportation, environment and place-shaping sectors. Use the link below to register your details for full, free access.

Already a registered? Login

 
comments powered by Disqus